The Resolve II arrived in Singapore fully prepared for her 1st dry docking and entered the dock at Seatrium’s Tuas Boulevard Yard on the 29th August 2024 directly from sea.
The project was well planned and no big surprises came up during the drydocking. The vessel’s hull had minimal fouling and coating damages, but as a fuel efficiency measure going forward, a premium anti-fouling was applied on the ship’s underwater hull.
After a busy and hectic 8 days, all in the drydock, she left yard as scheduled with a smooth and shining hull, her certificates successfully renewed, and equipment overhauled.
She bunkered and inerted the cargo tanks before loading gasoline in Singapore for discharge in Botany Bay, Australia.